 |
A Excavation of the pool site. |
B Survey and preliminary pool wall installation. |
 |
 |
C Securing panels and "A" frames into place with a concrete base collar. |
D Installation of coping. |
 |
 |
E Pouring concrete. |
F Liner installation. |
 |
 |
G Filtration System. |
H Finished pool w/completed deck. |
 |